This user has not added any information to their profile yet.
About Me
If you are laying over a concrete subfloor you will first need checked the concrete moisture, if the floor has a moisture content of over 4% then either wait until the sub floor dries to meet this level or use an appropriate moisture barrier, we recommend Sika Mb Primer to ensure no damp rises up into your new floor.
United States
Male
English
Find Me On